Naftan refinery
www.naftan.by
Head for the design office (bureau) Naftan refinery
From October 2007 to the present time, the head of the design office (bureau) Naftan refinery. Head of major investment projects for the construction and reconstruction of technological installations refinery at the pre-investment stage and the development of design and estimate documentation, implementation supervision. Project management and staff of the customer, working with technical and design documentation, directly involved in the conclusion of major international contracts (EP, EPC, EPCm) reconstruction and construction of process units of the Naftan refinery. Planning and resource management. Analysis and risk management. There is also a main executable functions must be classified - directly involved in the development and coordination of long-term plans for new construction, reconstruction and modernization of technological facilities of the enterprise; organization of customer service from the moment of formation of the technical requirements for the design and survey work (BDD) until putting into commercial operation. Addressing priority technical problems defining common technical policy of the company; formation of a "portfolio" in terms of determining priority of design work, with approval the schedule of activities with the key persons of the company. Participates in the development procedure of technical state standards (refinery and chemical technologies). Head for Project (Design) Office including - 98 engineers (designers and engineers, quantity surveyors), Project Management Office, the Analytical department, engineering training. Working with supervisors, public examination of the Ministry of Construction and Architecture, Ministry of Natural Resources and Environment, State Industrial Inspectorate of Ministry of Emergency Situations of the Republic of Belarus.
PROJECTS IN, WHICH TOOK PARTS:
1. Construction of the hydrocracking complex of petroleum residues - the project is completed; complex put into commercial operation (four processing units).
2. Construction of a low-temperature isomerization (DIH + PENEX Unit) - the installation was put into operation (project manager).
3. Construction of a vacuum unit Visbreaker -Thermal Cracking - installation put into operation (project manager).
4. Reconstruction of primary oil refining CDU AT-8 - the stage of completion of project activities and the active phase of construction and installation works.
5. Reconstruction of diesel hydrotreating units of type L-24/7, and the LCH-24/7 under the current production - reconstructed objects.
6. Construction of a delayed coking complex (delay coking unit (DCU+SWS), Elemental sulfur (Claus) unit, the installation of hydrogen production unit) - the stage of design work and construction of facilities.
7. Construction of a vacuum unit CDU it AVT-2 - stage design work and construction of the plant.
8. Reconstruction of the plant's overall return of flare gas system - the stage of design work and construction of the plant.
9. Construction of gasoline blending - the stage of design work and construction of the plant.
10. Reconstruction of the catalytic reforming of gasoline type LCH 35-11 / 600 - stage of feasibility study is completed, the finished base project, initiated procedures for selection of EPC contractor.
11. Modernization of technological schemes of installation of primary oil refining CDU AVT-6 complex and technologically interconnected systems during overhauls in 2008, 2011, 2014.
12. Projects replacement furnaces direct fire heating process unit of primary oil refining CDU-AVT-6 and Visbreaker-Thermal Cracking units, stage design work and construction and installation work.
13. Reconstruction projects of furnaces direct fire heating process for lube oils Phenolic cleanse and Bitumen production units - stage design work is completed.
14. Projects related to the reconstruction Storage Facilities, a project to build flyovers discharge of oil from the tanks with heating oil - the stage of completion of project activities and the active phase of construction and installation works.
15. Management of the customer development (processing) state normative-technical documentation. In particular manual processing VNTP 81-85 "Standards for technological design companies refining and manufacture of products of organic synthesis." On the completion of work on the territory of the Republic of Belarus was put into effect technical codes of practice TKP 440-2012 "Engineering standards enterprises refining and manufacture of products of organic synthesis," the customer of works acted "Naftan".